Our Slog (Ships Log) with a Satelite View
Google Map loading... |
Eric & Sherrell
Google Map loading... |
Posted on Friday Oct 6, 2006
Words (297)
Sometimes the “to-do” list seems endless – it can even get depressing at times. Since we’re getting ready to depart in a few weeks, we’ve been working extra hard and it seems like there’s not enough time. So I went over the list of things we’ve accomplished so far and now I feel a little better. I know I missed a few things but I thought I’d share the “done” list here.
Repaired broken dinghy wheel
Replaced 2 thru-deck fills
Emptied/Removed/Cleaned/Installed Fuel Tank
Installed new fuel fill hose for tank
Repaired/Painted manual bilge pump
Installed new filter system for drinking water
Designed/fabricated new dodger frame
Had new dodger and bimini made
Had new lycra suit made for Sherrell
Designed/fabricated water towed generator
Cleaned jerry cans
Removed/Cleaned Stove
Fiberglass/Painted area behind Stove
Polished Stainless Steel fittings
Sewed bag for surfboard
Sewed bag for anchor chain
Sewed 3 new pillows
Sewed bean bag pillow
Sewed covers for our new cockpit chairs
Cleaned/repaired fittings on toilet
Caught/Fixed/Released/Adopted 24 wild cats
Uninstalled electronics in event of lightening strike
Removed roller furling jib
Sanded/finished all external teak wood
Worked on two website design projects
Volunteer work for 3 websites
Added insulation to icebox
Added insulation to galley food lockers
Cleaned all shelves/teak oiled interior
Sorted books/DVD’s/CD’s
Designed new LED anchor light with more lights
Sherrell had gall bladder removed
Ok the last item wasn’t really on the list, but there’s no time like the present to deal with a medical problem that could become deadly like gall stones. So if you’re counting, that’s 5 surgeries in 9 months for poor Sherrell – that’s a lifetimes worth.
Posted on Friday Aug 4, 2006
Words (87)
This post contains a GPS location. Click here to see it on the map.